Drake Circus Shopping Centre, Plymouth

17/10/2012 - IMBC Exeter Ltd have carried out some works on site for McLaren Construction at the Drake Circus Shopping Centre which is situated in the heart of Plymouth! It is one of the West Country’s most popular shopping centres.

read more

The Shard, London Bridge Quarter, by MACE

09/10/2012 – The construction works continue on the Mace site at The Shard, London Bridge quarter and SafeStand® Access Systems continues to be used by the various contractors completing the works there. In the last couple of weeks companies such as Comast Construction Ltd, Pacebrow UK Ltd and Winchmore Brickwork Ltd have chosen to use SafeStand® Access Systems for their works on site which includes the construction of…

read more

The Olympic Torch Relay Reaches Wembley

25/07/2012 – The Olympic Torch Relay arrived at Wembley today creating a carnival atmosphere amongst the locals and drawing huge crowds from homes and offices in the locality. The legendary Gordon Banks was cheered by the huge crowds as he ran with the flame outside Wembley Stadium, scene of England’s 1966 World Cup victory, on the 68th day of the torch relay. Gordan Banks carries the Olympic torch past the iconic…

read more

BAM Construction commences work on Phase Two at Aston University

30/01/2012 – BAM Construction is currently underway with work on Phase Two of the £215 million Aston University student accommodation scheme.  The high standard accommodation on campus is one of the biggest regeneration projects in the Midlands. The Project incorporates the latest energy-effecient materials and systems and Safestand Access Systems has been used to carry works on both Phase one (constructed by Carillion)…

read more

SafeStand is used at Park Campus, Northampton University by Stepnell Ltd.

04/11/2011 – SafeStand® has been used by Stepnell Ltd on the construction of the Fawsley Building, as part of the Park Campus (University of Northampton).

read more

Laing O’Rourke – Vehicle Edge Protection

23/04/2011 – To solve the problem of Vehicle Edge Protection whilst unloading 40’ Flatback Trailers, Laing O’Rourke in Barnsley, after much deliberation and cost planning exercises, have decided to utilise SafeStand® Access Systems to provide protection from falls for their workforce whilst unloading and loading construction materials. Laing O’Rourke utilising Safestand® for Vehicle Edge Protection

read more

Construction On Thin Ice

23/09/2010 – Mark Starling, Safety, Health & Environmental Manager, Kier Partnership Homes is starting on an adventure to the 1996 Position of the Magnetic North Pole covering a distance of 360 nautical miles. He set out from Resolute Bay in the high Canadian Arctic heading to the Magnetic North Pole. Mark placed the SafeStand® flag in the ice in appreciation of the SafeStand® sponsorship that he received. Mark Starling…

read more

SafeStand Goes Underwater At The Olympics

25/08/2010 – SafeStand® is used by WB Simpson & Sons (Tiling) Ltd & Balfour Beatty to tile the Aquatic Centre’s swimming pool for London 2012 Olympics. Olympic Aquatics Centre London 2012

read more

Reaching New Heights – The Gerkin

04/09/2006 – SafeStand® Access Systems have recently been utilised on the 23rd Floor of “The Gerkin” Building in London by Coffey Construction Ltd. 23 St Mary’s Axe, The London Gerkin

read more

Wembley Stadium

11/05/2005 – SafeStand® used by brickwork subcontractor, Pyramid Builders Ltd to ensure outputs are maximised when constructing the blockwork walls at the iconic Wembley Stadium for Multiplex Construction – the largest  blockwork package placed in the UK to date. Pyramid Builders at Wembley Stadium

read more
Page 8 of 8« First...45678