+44 (0)208 795 3579

Romford Rail Operating Centre (ROC)

31/10/2014 –  This £32m Network Rail operation and training facility will control the Anglian rail network when in full operation. UMC Architects worked as lead designer with Volker Fitzpatrick, co-ordinating the design using Building Information Modelling (BIM).  The fully integrated Revit model was used for clash detection and integration of building services, along with the Network Rail fit-out. The ROC is one of 12 new facilities that will replace existing operating sites and control the entire UK rail network. Volker Fitzpatrick chose to utilise SafeStand® Access Systems to provide working platforms to carry out the blockwork package on site.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]