Safestand® Back At London Zoo
17/01/2013 Buxton Building is back at London Zoo and Safestand Access Systems have once again been selected as the preferred method of access to carry out the works at the Zoo.
Buxton have begun work on the Regent Building, the works involve the construction of a new double storey extension, alterations to existing and a new mezzanine floor, this will create an exciting new restaurant. Once again Safestand Access Systems have been recognised as a cost effective and safe system to carry out works at height on the Regent Building.
This project follows previous successful projects at the Zoo including the Penguin Beach.
SafeStand® News
Product Launch: SafeStand® End Staircase Gate Bracket
18th October 2023
Product Launch: SafeStand® Hoddi Hoist Bracket
22nd September 2023
The Shepperton Studio Works Continue
25th May 2023
Download
Download our latest catalogue here with all the latest information about SafeStand® Access Systems.
Newsletter
Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.
SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]