Safestand® Gears Up For Reading Station Upgrade
06/02/2013 – Safestand® Access Systems have started being used on the Reading Station Redevelopment Project. Principal Contractor Costain have awarded the brick and blockwork package to Lee Marley Brickwork who in turn have chosen to use Safestand® as their preferred low level access system at the £900m upgrade to the station.
Work at Reading station due for completion in 2015.
SafeStand® News
Product Launch: SafeStand® End Staircase Gate Bracket
18th October 2023
Product Launch: SafeStand® Hoddi Hoist Bracket
22nd September 2023
The Shepperton Studio Works Continue
25th May 2023
Download
Download our latest catalogue here with all the latest information about SafeStand® Access Systems.
Newsletter
Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.
SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]