The Shepperton Studio Works Continue

25th May 2023

The iconic Shepperton Studios have been expanding for the past few months as part of the Pinewood Group’s vision to create 17 additional stages totalling over 1.2 million square feet. SafeStand® Ltd has supplied our low-level access systems to the Laing O’ Rourke project to construct the internal blockwork walls within these spaces and studios. Swift Brickwork Ltd is responsible for the blockwork package on the £500 million project, and they have chosen the SafeStand systems to construct the walls up to 4000mm in height. SafeStand® has supplied two distinct systems (SafeStand 1200 & SureStand 800) to accommodate the various wall heights required. Due to the SafeStand® simplicity and ease of use, it allows Swift Brickwork to build walls of varied lengths and heights at their own pace, independent from other trades using traditional methods.

Latest Articles