Safestand® used at Blurton Extracare Scheme
06/01/2015 – Eric Wright Construction and Keith Walton Brickwork are utilising Safestand® on the Blurton Extracare Scheme. The new building will provide 75 self-contained one and two bedroomed apartments in three blocks linked together by covered bridges.
Created for people aged over 55, the villages will offer spacious apartments within a community setting, with facilities on site and conveniently located transport links .
Construction is a maximum of three storey high and mainly traditional brickwork with double pitched tiled roofs on a mixture of piled and traditional foundations and is expected to be completed in 2016.


