Safestand Redeveloping Wardour Street
17.12.2013 Safestand continues it’s repeat business work with Grangewood Brickwork Services and is being used on a mixed-use development at the Ampersand Scheme at 180 Wardour Street, headed by McLaren Construction.
The Ampersand project is a refurbishment of an existing mixed-use office block and will include four storeys of office space, aimed at occupiers from London’s creative sector, with an additional two floors of high-specification residential space, including a combination of duplex and single-storey apartments, each with terraces providing views over Oxford Street.
Finishes to the apartments will include natural stone, bronze detailing, bespoke kitchen installations and state-of-the-art fixtures and fittings.
Construction will include the demolition of the top floor, with alterations to the existing building structure.
Major modifications will include the installation of a new three-story structural steel frame and the reorientation of the main entrance, relocated to the corner of Wardour Street and Hollen Street. The remainder of the ground floor will continue as live retail throughout the construction period with one occupier being relocated as part of the redesign of the office entrance.
Conservation work will also be carried out on the Oxford Street façade, which dates back to 1885, to clean and retain the original features of the building. The project is due for completion in September 2014.
SafeStand® News
Product Launch: SafeStand® End Staircase Gate Bracket
18th October 2023
Product Launch: SafeStand® Hoddi Hoist Bracket
22nd September 2023
The Shepperton Studio Works Continue
25th May 2023
Download
Download our latest catalogue here with all the latest information about SafeStand® Access Systems.
Newsletter
Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.
SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]