Old Relationships Reignited (McNamara & SafeStand®)

+44 (0)208 795 3579

Old Relationships Reignited (McNamara & SafeStand®)

5th April 2019

M.B. McNamara are on site constructing a 182-bedroom Hotel on Ealing’s Uxbridge Road. This Design and Build contract consists of nine floors over a single level basement and has been designed by Architects Dexter Moren Associates.

This is the first contract in the UK for Irish contractor M.B. McNamara Construction Ltd and builds on their history of using SafeStand® Access Equipment on multiple contracts in Ireland.

On this occasion Mega Brickwork Ltd will be using the SafeStand® to construct blockwork walls throughout the building. Mega Brickwork and SafeStand® have worked together on multiple construction contracts in the past.

Situated moments away from Ealing Common, the property will be the newest addition to the Seraphine Hotels Group portfolio. A contemporary colonnade and low-level tree planting in a newly created public square will realise Hampton by Hilton’s ‘boulevard aspiration’ for the hotel and its location. With a conservation area located to the rear of the site, the hotel’s facade will take design inspiration from natural form on a small scale. A series of shingled panels will clad the exterior to emulate the look of autumn leaves in both colour & texture. Facilities are to include a breakfast area for hotel guests as well as a bar, breakout zones & work spaces to draw in local clientele from nearby offices.

PROJECT DETAILS
• Category: Hotel
• Location: Uxbridge Road, Ealing
• Size: 4,260m2
• Duration: 21 months
• Value: £17m

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]

Hounslow Heath Junior School

+44 (0)208 795 3579

Hounslow Heath Junior School

29th March 2019

Borras Construction Ltd have hired our SafeStand® 1200 system to complete the blockwork on Hounslow Heath Junior School. The development which first began in September 2017 has been broken down into different sections thus allowing the school to operate during the works.

Some of the updates and new facilities will include the remodelling of the existing assembly hall, enlarging existing classrooms and office space. Also planned are 14 new classrooms, 5 specialist classrooms & a new ICT suite.

This project’s planned completion date is autumn 2019.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]

The Engine Yard

+44 (0)208 795 3579

The Engine Yard

22nd March 2019

Allenbuild Ltd are using our SureStand® 800 system to provide a safe working platform on The Engine Yard in Edinburgh. This location was previously home to Edinburgh’s historic tram depot, built in 1898.

Allenbuild Ltd are working with our equipment to transform the old depot into a new housing complex boasting 376 new homes including 1, 2 and 3 bedroom apartments, duplexes and 12 penthouses. While the interiors will be fairly modern, the exterior will draw upon Edinburgh’s traditional architecture and you will also be able to find remnants of the old cable tramway just up the road from the complex which is being preserved for the future.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]

Sherborne Care Home

+44 (0)208 795 3579

Sherborne Care Home

15th March 2019

Acheson Construction Ltd have recently started the development of Sherborne Care Home and have chosen our SureStand system as their preferred method of access for the internal blockwork which will be completed by LC Wills Contracts Ltd.

At present the ground floor is completed and brick and blockwork continues on the first floor.

This project is on behalf of Barchester Healthcare who specialise and pride themselves in the care they provide to older people. This project will be a 3 storey 64 bed residential home including leisure facilities.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]

SMAS Certification

+44 (0)208 795 3579

SMAS Certification

22nd February 2019

We are proud to announce that we have recently succeeded in passing our SMAS (Safety Management Advisory Services) Audit. SMAS is a member of Safety Schemes in Procurement (SSIP).

Our SMAS Certification enables us to quickly and easily demonstrate our H&S competence to clients and is recognised by the majority of construction contractors throughout the UK.

The audit covers all our Health & Safety Documents and Processes including Policies, Procedures, Training and H&S Practises and helps ensure that we are compliant with all UK Health & Safety Regulations.

Download

Download our latest catalogue here with all the latest information about SafeStand® Access Systems.

Download Now

Newsletter

Subscribe to the SafeStand® newsletter to receive updates about products and promotions. Simply enter your email address.

SafeStand Limited Unit 6 Fourth Way Wembley Middlesex HA9 0LH Tel: 020 8795 3579 Email: [email protected]